a walkthrough with stand-ins — a demonstration, not a finding · 20 certified links · outlined boxes are the roots · tap a claim to read it in full
Showing every action the room judged: it acts directly on 1 of the 6 root causes. It does not act directly on 5.
WHAT WAS PREDICTED TO FOLLOW
Each number on the map marks a root cause that action reduces.
① No production deploy after 14:00 on Fridays unless the on-call engineer agrees
we expect: the same cause stops coming back once fixing it is in the sprint
measured by: repeat outages with the same cause, per quarter
due 23 Jan 2027
guesses: the room: 3 (median of 15, spread 1 to 6)
② Give the shared schema one named owner and a migration tool with rollback
no prediction about this action yet
③ Reserve one engineer-week per sprint for post-mortem actions, first in the sprint, not last
no prediction about this action yet